Fine dust
- Reachable horizontal surfaces
- Trim, sills and ledges
- Cabinet and fixture exteriors
- Floors and edges
Construction dust settles on more than floors. PRMB Cleaning scopes the finished areas, fine-dust load, surface types and handoff deadline so the final clean is scheduled after active work and heavy debris removal.
The exact checklist depends on the project. A completed, safe site with utilities, access and heavy debris already handled gives the cleaning team the best chance to prepare the space for occupancy or walkthrough.
Cleaning too early allows sanding, cutting, touch-ups and contractor traffic to reintroduce dust. Tell us whether the project is fully complete or needs phased cleaning, and identify any trades returning after the visit.
After dusty work, punch-list repairs and heavy debris removal are complete, but before furniture or occupants limit access whenever possible.
Heavy debris hauling is not assumed. Describe or photograph remaining materials so we can identify what must be removed by the contractor and what can be included.
Possibly. Phased cleaning needs clear separation between completed and active work zones and may require more than one visit.
No. Removal depends on the product and surface, and aggressive methods may cause damage. Specialty residue is evaluated before it is included.
Send the location, square footage, photos, completion status, remaining trades and target walkthrough date.
Request a project quote